OPTION A

Manufactured Rock, Metal Letters with Lighting BEHIND each letter (back lighting). 

Manufactured Rock, Metal Letters with Lighting behind each letter (back lighting). 

A manufactured rock is a rock that looks realistic and can be created to the size and shape you desire. 

Metal Lettering has a 3Dimensional (3D) look and would be installed on the rock with lighting behind each lettering.

Lighting behind each lettering provides a stylish look that has a glow behind each letter without shadows on the lettering.

Cost $20,499 (lighting included) plus Electrical conduit, concrete pad, crane & permits

Manufactured Rock – 14’wide x6’6”tall x10” thick – $12,282

Metal Letters Installed on rock includes lighting – $8216.68

Lighting for Lettering –  $Included

Electrical Conduit from Meter to Rock Base – approx 25 ft – $TBD

Concrete Pad to anchor the rock – $1500~

Engineering of Concrete Pad – required by rock supplier – $600~

Crane truck to lift and position rock – $TBD

City permit fees – $65 ~

Electrical Permit Fees –  $TBD

Samples of what Option A will look like (Metal Lettering with Back Lit Lighting on each letter).  NOTE: this does not show the manufactured rock this only shows the metal lettering with the back lighting.

Sample of What 3Dimensional (3D) Metal Lettering looks like up close

OPTION B

Manufactured Rock, Sandblasted Lettering and Front Lighting (either hardwired or solar).
With upgrade option to 3D Metal Lettering

Manufactured Rock, Sandblasted Lettering and Front Lighting (either hardwired or solar). 

A manufactured rock is a realistic looking rock that can be created to any size and shape desired. 

Sandblasted lettering is when the letters are carved out of the flat face of the rock.  This option B has an upgrade option to 3Dimensional (3D) Metal Lettering

Front lighting can be either hardwired or solar and provides light shining from the ground up to the face of the sign. Front lighting does create some shadowing on the sign.

Cost $10,000 plus Lighting, Electrical conduit, concrete pad, crane & permits

Option to upgrade and add Metal Lettering for a 3Dimensional (3D) effect Add $2839

Manufactured Rock – 132” wide x 68” tall x 10” thick – $10,000

Sand Blasted Lettering – $Included

Lighting – hardwired or Solar = $TBD

Electrical Conduit from Meter to Rock Base – approx 25 ft – $TBD

Concrete Pad to anchor the rock – $1500~

Engineering of Concrete Pad – required by rock supplier – $600~

Crane truck to lift and position rock – $TBD

City permit fees – $65 ~

Electrical Permit Fees – $TBD

Samples of what Option B will look like (Sand Blasted with FRONT Lighting).  NOTE: this does not show the manufactured rock this only shows the Sand Blasted Lettering with lighting that shines on the sign from the FRONT.

Option B to upgrade and Add the Metal Lettering for a 3Dimensional (3D) look with Front Lighting. If you want to look at one of these up close – the Shadow Ridge sign is in Entiat right on the highway as you go thru.

OPTION C

Real Rock, Sandblasted Lettering and Front Lighting (either hardwired or solar).

Real Rock, Sandblasted Lettering and Front Lighting (either hardwired or solar).

Real rock is subject to whatever size the rock companies have available. Likely will be smaller and less significant.

Sandblasted lettering is when the letters are carved out of the flat face of the rock.

Front lighting can be either hardwired or solar and provides light shining from the ground up to the face of the sign. Front lighting does create some shadowing on the sign.

Cost $9880.00 plus Lighting, Electrical conduit, concrete pad, crane & permits

Currently real rock suppliers only have smaller rocks available (approx 8’x5′)

Real Rock – Valdes Sandstone or Salt & Pepper granite Rock (8′ to 12′) – $9880

Sand Blasted Lettering – $Included

Lighting – hardwired or Solar = $TBD

Electrical Conduit from Meter to Rock Base – approx 25 ft – $TBD

Concrete Pad to anchor the rock – $1500~

Engineering of Concrete Pad – required by rock supplier – $600~

Crane truck to lift and position rock – $Included

Rigging Man Charge ($85 per hr – 8 hr min) – $included

City permit fees – $65 ~

Electrical Permit Fees – $TBD

Examples of what a real rock with Sandblasted Lettering with FRONT lighting (hardwired or Solar) looks like:

Please read each option and then VOTE FOR ONE OPTION on your voting sheet that was sent to you in the mail.

QUESTIONS? click here to go to the FAQs